FY 2004 HEP Targets
All HEP Facilities:
Maintain and operate HEP facilities such that unscheduled downtime is on average less than 20% of the total scheduled operating time
[Fermi data and SLAC data]
Proton Accelerator-Based Physics/Facilities
Deliver data as planned within 20% of the baseline estimate (240 pb-1) to CDF and D-Zero detectors at the Tevatron.
Electron Accelerator-Based Physics/Facilities
Deliver data as planned within 20% of the baseline estimate (45 fb-1) to the BaBar detector at the SLAC B-factory.
Construction/Major Items of Equipment
Maintain cost and schedule milestones for upgrades and new major construction projects within 10% of baseline estimates.