Office of High Energy Physics

FY 2006 HEP Targets

All HEP Facilities:

Maintain and operate HEP facilities such that unscheduled downtime is on average less than 20% of the total scheduled operating time

[Fermi and SLAC data]

Proton Accelerator-Based Physics/Facilities

Deliver data as planned within 20% of the baseline estimate (675 pb-1) to CDF and D-Zero detectors at the Tevatron.

[Fermi data]

Deliver 1x1020 protons on target for the MINOS experiment at NuMI facility.

[Fermi data]

Electron Accelerator-Based Physics/Facilities

Deliver data as planned within 20% of the baseline estimate (100 fb-1) to the BaBar detector at the SLAC B-factory.

[SLAC data]

Construction/Major Items of Equipment

Maintain cost and schedule milestones for upgrades and new major construction projects within 10% of baseline estimates.

[Project data]