FY 2007 HEP Targets
All HEP Facilities:
Maintain and operate HEP facilities such that unscheduled downtime is on average less than 20% of the total scheduled operating time
Proton Accelerator-Based Physics/Facilities
Deliver data as planned within 20% of the baseline estimate (800 pb-1) to CDF and D-Zero detectors at the Tevatron.
Deliver 1.5x1020 protons on target for the MINOS experiment at NuMI facility.
Electron Accelerator-Based Physics/Facilities
Deliver data as planned within 20% of the baseline estimate (130 fb-1) to the BaBar detector at the SLAC B-factory.
Construction/Major Items of Equipment
Maintain cost and schedule milestones for upgrades and new major construction projects within 10% of baseline estimates.